As part of the services MCD Fire provide, during the CC stage, in conjunction with the PCA, we can provide early advice and scope of services on the documentation required to ensure a smooth as possible process from CC through to Occupation Certificate (OC) stage. This may involve separate Fire Engineering Brief (FEB) and Fire Engineering Report (FER) or combined reports depending on the extent of the non-compliances.

Fire Engineering Peer Reviews
A peer review is sometimes required to provide the client, the PCA and other stakeholder’s greater assurances in the proposed fire safety design during the