Glanbia & Green Isle Foods

Glanbia Foods are a leading nutrition and ingredients group operating in 34 countries with HQ in Ireland with shares listed on the Irish and London Stock Exchanges. Green Isle Foods is Ireland’s largest frozen food producer with HQ in Co. Kildare, which Mark was involved with a fire safety engineer. Mark has worked on a […]

Turlough Hill Power Station

The Turlough Hill Power Station is Ireland’s only pumped-storage hydroelectricity plant owned operated by the Irish energy provider Electricity Supply Board (ESB). The plant is located within the mountain and using the stored water on the surface as its source of hydro power. Mark was involved in carrying out an audit of the existing underground […]

Coca Cola Campuses

Mark was involved in liaising with Coca Cola representatives and councils in various jurisdictions on multiple projects across their Irish bases including their EMEA (Europe Middle East and Africa) serviced plants and beverage production facilities. Marks role as fire safety engineer was to prepare and submit documentation to the relevant stakeholder and then to the […]

Dell Computers EMF 1 & 3

Mark was involved in liaising with Dell and the local authorities in ensuring fire safety legislative compliance was met in refurbishing this massive facility that accommodated approx. 3,000 staff members in one it its largest facilities in Europe. Mark prepared both fire safety certificate reporting and drawings in support of successful Fire Safety Certificates based […]

Rheem Australia

Mark performed the lead role on a large extension and refurbishment to the existing Rheem facility at Rydalmere. As part of this role, Mark worked closely with the Client and Certifier in developing the fire engineering alternative solution that addressed the exit arrangement, travel distances, smoke hazard management etc including the 3D computer fire and […]

Interface Carpets

Mark worked on the fire engineering alternative solution and construction stages of Project Renaissance for Interface Australia following the July 2012 fire that destroyed its Picton factory. As part of the design of the alternative solution, Mark was involved in reviewing the exit arrangements, travel distances, compartmentation, smoke hazard management etc which were all rationalised, […]